Disaster RecoveryUpdated July 3, 2026
Disaster Recovery & Business Continuity
disaster-recoverybusiness-continuitydr-strategybackuprestorertorpotestingepicazureoperations
Disaster Recovery & Business Continuity
Welcome to our Disaster Recovery & Business Continuity section. This area provides comprehensive guidance on protecting our Epic on Azure infrastructure from disasters and ensuring business operations can continue during outages.
Quick Navigation
| Area | Description | Status |
|---|---|---|
| DR Strategy | Overall disaster recovery approach | ๐ Planning Phase |
| Recovery Plans | Detailed recovery procedures | ๐ Planning Phase |
| Backup & Restore | Data protection procedures | ๐ Planning Phase |
| Testing & Validation | DR testing and exercises | ๐ Planning Phase |
| Business Continuity | Operational continuity planning | ๐ Planning Phase |
Recovery Objectives
๐ Key Metrics
- RTO (Recovery Time Objective): Maximum acceptable downtime
- Critical Systems: 4 hours
- Important Systems: 8 hours
- Standard Systems: 24 hours
- RPO (Recovery Point Objective): Maximum acceptable data loss
- Critical Data: 15 minutes
- Important Data: 1 hour
- Standard Data: 4 hours
๐ฏ Service Tiers
| Tier | Description | RTO | RPO | Recovery Method |
|---|---|---|---|---|
| Critical | Epic production systems | 4h | 15m | Hot standby + Azure Site Recovery |
| Important | Supporting infrastructure | 8h | 1h | Warm standby + Automated failover |
| Standard | Development/testing | 24h | 4h | Cold standby + Manual restoration |
Disaster Scenarios
๐ช๏ธ Natural Disasters
- Data center outages (fire, flood, earthquake)
- Regional Azure outages
- Network infrastructure failures
- Power grid failures
๐ก๏ธ Technology Disasters
- Hardware failures (servers, storage, network)
- Software failures and corruption
- Cyber attacks and ransomware
- Human error and configuration mistakes
๐ข Business Disasters
- Pandemic and workforce unavailability
- Vendor and supplier failures
- Regulatory and compliance issues
- Financial and operational disruptions
Recovery Architecture
graph TB
A[Primary Region - East US] --> B[Secondary Region - West US]
A --> C[Backup Storage - Azure Blob]
B --> D[Tertiary Region - Central US]
subgraph "Primary Components"
E[Epic Production]
F[Database Cluster]
G[Application Servers]
end
subgraph "DR Components"
H[Epic DR Site]
I[Database Replica]
J[Standby Servers]
end
E --> H
F --> I
G --> J
subgraph "Backup Strategy"
K[Daily Full Backup]
L[Hourly Incremental]
M[Transaction Log Backup]
end
F --> K
F --> L
F --> M
Recovery Procedures
Phase 1: Assessment & Activation
- Incident Detection: Automated monitoring alerts
- Impact Assessment: Determine scope and severity
- DR Team Activation: Notify key personnel
- Communication: Stakeholder notification
Phase 2: Failover & Recovery
- Service Isolation: Isolate affected systems
- Data Recovery: Restore from backups/replicas
- System Activation: Bring up DR systems
- Service Validation: Test critical functions
Phase 3: Operations & Monitoring
- Service Monitoring: Continuous health checks
- Performance Tuning: Optimize DR environment
- User Communication: Status updates
- Documentation: Record all actions
Phase 4: Restoration & Review
- Primary Site Recovery: Rebuild/repair primary
- Data Synchronization: Sync changes back
- Failback Planning: Coordinate return to primary
- Post-Incident Review: Lessons learned
Backup Strategy
Database Backups
- Full Backups: Daily at 2 AM UTC
- Differential Backups: Every 6 hours
- Transaction Log Backups: Every 15 minutes
- Retention: 30 days local, 365 days archive
Application Backups
- Configuration Backups: Daily
- Code Repositories: Real-time replication
- Custom Applications: Weekly full backup
- Retention: 90 days standard
Infrastructure Backups
- VM Snapshots: Daily via Azure Backup
- Infrastructure as Code: Git repository
- Network Configurations: Weekly exports
- Retention: 30 days operational, 7 years compliance
Testing & Validation
Testing Schedule
- Monthly: Component-level DR tests
- Quarterly: Application-level failover tests
- Semi-Annual: Full DR exercise
- Annual: Business continuity simulation
Test Types
- Planned Tests: Scheduled maintenance windows
- Surprise Tests: Unannounced exercises
- Partial Tests: Single component validation
- Full Tests: Complete environment failover
Success Criteria
- RTO/RPO objectives met
- All critical functions operational
- Data integrity verified
- Communication procedures effective
Business Continuity Planning
Operational Continuity
- Remote work capabilities
- Alternative communication channels
- Vendor contingency plans
- Supply chain alternatives
Stakeholder Management
- Executive notification procedures
- Customer communication plans
- Vendor coordination protocols
- Regulatory reporting requirements
Azure DR Tools & Services
| Tool | Purpose | Access Method |
|---|---|---|
| Azure Site Recovery | VM replication and failover | Azure Portal โ Recovery Services |
| Azure Backup | Centralized backup management | Azure Portal โ Backup Center |
| Azure SQL Database | Built-in geo-replication | Azure Portal โ SQL Databases |
| Azure Storage | Geo-redundant storage | Azure Portal โ Storage Accounts |
Contact Information
For DR activation or business continuity concerns:
- Emergency Response: Contact your immediate supervisor
- After Hours: Use established on-call procedures
- Azure Support: Contact through Azure Portal support
Next Steps
This disaster recovery documentation is in active development. Key areas being planned:
- Detailed Recovery Procedures: Step-by-step recovery guides
- Testing Schedules: Regular DR testing calendar
- Tool Integration: Automated failover procedures
- Training Materials: DR team training resources